New Construction • Carver, MA
South Coast Development provided full design/build services to acquire, design, permit, and build this New-to-Industry Gasoline Service Station. This 3.32 acre site was improved with (1) 20,000 gallon tank & (1) 15,000 gallon split tank, (1) 26’ x 130’ canopy, (5) MPD’s, a 4,250 square foot convenience store, and a Drive Thru.
Permitting this location required approvals from Planning, Selectman, Conservation, and Mass Highway. In addition to normal driveway permits, Mass Highway granted approval to alter the “No Access” line on Route 58.
This site is currently leased to New England Farms, Honey Dew, and Subway.
Permitting this location required approvals from Planning, Selectman, Conservation, and Mass Highway. In addition to normal driveway permits, Mass Highway granted approval to alter the “No Access” line on Route 58.
This site is currently leased to New England Farms, Honey Dew, and Subway.